Vol 26 No 8 (2020)

Published: 2020-11-05

Articles

The Guatemalan construction characterizaton of the perceived risk by managers of suffering work accidents

Francisco Arturo Hernández-Arriaza, José Pérez-Alonso, Marta Gómez-Galán, Ferdinando Salata, Ángel Jesús Callejón-Ferre
Abstract 1239 | PDF Downloads 905 | DOI https://doi.org/10.3846/jcem.2020.13727

Page 705-716

Page 717-732

Development of K-BIM e-Submission prototypical system for the openBIM-based building permit framework

Inhan Kim, Jungsik Choi, Evelyn Ai Lin Teo, Hongwei Sun
Abstract 16426 | PDF Downloads 2078 | DOI https://doi.org/10.3846/jcem.2020.13756

Page 744-756

Physical parameters, tensile and compressive strength of dolomite rock samples: influence of grain size

Ali Lakirouhani, Farhad Asemi, Afshin Zohdi, Jurgis Medzvieckas, Romualdas Kliukas
Abstract 2051 | PDF Downloads 1268 | DOI https://doi.org/10.3846/jcem.2020.13810

Page 789-799

Measuring value-added-oriented BIM climate in construction projects: dimensions and indicators

Lei Zhang, Jingfeng Yuan, Nini Xia, Yan Ning, Junwei Ma, Mirosław J. Skibniewski
Abstract 1703 | PDF Downloads 1005 | DOI https://doi.org/10.3846/jcem.2020.13893

Page 800-818

Protocol development: level of preventive action method, considering the preventive environments in construction works

Antonio José Carpio, María de las Nieves González, Inmaculada Martínez, María Isabel Prieto
Abstract 1142 | PDF Downloads 802 | DOI https://doi.org/10.3846/jcem.2020.13598

Page 819-835