Share:


Post-occupancy evaluation of Pagerjurang Permanent Housing after the Merapi volcanic eruption

Abstract

Merapi Volcano erupted in 2010 and a community-based relocation of the destroyed area was implemented step by step in 2011, 2012, and 2013. This study, therefore, employed the Post-Occupancy Evaluation (POE) Method to investigate the ability of the new (permanent) housing model in Pagerjurang Kepuharjo Village, Yogyakarta to make its residents feel at home more than the old one and to determine the residents’ responses to their life after 10 years of living in the new model. Questionnaires were used to collect responses from 24 families and the results showed the residents became comfortable after 2 years of living in the new (permanent) housing due to the fulfillment of the post-disaster basic needs and do not wish to be back and live in their old houses. They were also reported to have felt satisfied with the new facilities such as the well-designed infrastructure including clean water, sanitation, electricity, streets, and evacuation routes as well as the well-designed layout with the houses built together (gotong-royong) to ensure more efficiency in terms of design. The model was also supported by the Government in terms of housing cost subsidy. In conclusion, the new community-based (permanent) housing has the ability to create a homey atmosphere and helps to ease the post-eruption recovery.

Keyword : POE, Pagerjurang, post-disaster, housing, relocation

How to Cite
Setiadi, A., Andriessen, A., & Anisa, R. (2020). Post-occupancy evaluation of Pagerjurang Permanent Housing after the Merapi volcanic eruption. Journal of Architecture and Urbanism, 44(2), 145-151. https://doi.org/10.3846/jau.2020.11265
Published in Issue
Oct 14, 2020
Abstract Views
1222
PDF Downloads
697
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

References

Alexandria, W. (2015). Global volcano risk quantified. UN Assessment aims to save lives. Journal of Aiding Planning Nature, 519.

Aliakbarlou, S., Wikinson, S., Costello, S. B., & Jang, H. (2018). Conceptual client value index for post disaster reconstruction contracting services. KSCE Journal of Civil Engineering, 22(4), 1067−1076. https://doi.org/10.1007/s12205-017-0432-1

Aliyu Ahmad, M. S. (2016). A review of post-occupancy evaluation as a tool and criteria for assessing building performance. In Proceedings of the Academic Conference on Agenda for Sub Sahara Africa (Vol. 4, No. 1). FCT Nigeria.

Amoah, K. A. (2016). Post occupancy evaluation of postgraduate students hostel facilities and services. Journal of Building Performance, 7.

Bilau, A. A., & Witt, E. E. (2016). An analysis of issues for the management of post-disaster housing reconstruction. International Journal of Strategic Property Management, 20, 265−276. https://doi.org/10.3846/1648715X.2016.1189975

BNPB. (2011). Document Reports on Mt. Merapi Post-Eruption Action of Rehabilitation and Reconstruction in the Provinces of Special Region of Yogyakarta and Central Java in 2011-2013.

BPBD Sleman. (2010). Pagerjurang permanent housing profile after the Merapi volcanic eruption. Badan Penanggulangan Bencana Daerah Sleman. https://bpbd.slemankab.go.id/profil-huntap-pagerjurang-ta-2017/

Eke, C., Aigbavboa, C., & Thwala, W. (2013). An exploratory literature review of post occupancy evaluation. Paper presented at the Proceedings of the International Conference on Civil and Environmental.

Fu, T.-H., Lin, W.-I., & Shieh, J.-C. (2013). The impact of post disaster relocation on community solidarity: The case of postdisaster reconstruction after Typhoon Morakot in Taiwan. World Academy of Science, Engineering and Technology, 78, 1964–1967.

Grath, M. (2011). A post-occupancy evaluation (POE) study of student accommodation in an MMC/modular building.
Structural Survey, 23(3), 244−252.
https://doi.org/10.1108/02630801111148211

Gunawan, H. (2014). Community preparedness in disaster management: case study in Cangkringan, Sleman District–DI Yogyakarta. e-Jurnal Informasi, 19(2), 91−106.

Haraty, H. J. S., & Utabera, N. (2018). The importance of culture in disaster management in Malaysia. In M. Awang, & M. Isa (Eds.), In International Conference on Architecture and Civil Engineering Conference.
https://doi.org/10.1007/978-981-13-2511-3_7

Hassabain, M. A. (2016). Post-occupancy evaluation of a university student cafeteria. Architectural Engineering and Design Management, 12(1), 66−77. https://doi.org/10.1080/17452007.2015.1092941

Iba, T. M. A. (2016). A pattern language for living well with dementia: Words for a Journey. International Journal of Organisational Design and Engineering, 4(1/2).
https://doi.org/10.1504/IJODE.2016.080160

Khair, N., Ali, H. M., Sipan, I., Nur Hafizah Juhari, & Siti Zaleha Daud. (2015). Post occupancy evaluation of the physical environment in public low-cost housing. Jurnal Teknologi (Sciences & Engineering), 75(10), 155−162.

Mathers, N. (2016). Survey and questionnaires. In The NHR RDB for the East Midlands.

Pemerintah Provinsi Daerah Istimewa Yogyakarta. (2011). The Provincial Government of the Special Region of Yogyakarta, Office of General Affairs, Housing, Energy and Mineral Resources.

RDTR. (2011). Rencana Detail Tata Ruang Kawasan Gunung Merapi (RDTR Kawasan Gunung Merapi) (Mt. Merapi’s Detailed Spatial Plan).

Sangasumana, P. (2018, November). Post disaster relocation issues: a case study of Samasarakanda Landslide in Sri Lanka edition. European Scientific Journal, 14(32), 1857–7881. https://doi.org/10.19044/esj.2018.v14n32p1

Tipple, G. (2005). Housing and urban vulnerability in rapidly-developing cities. Journal of Contingencies and Crisis Management, 13, 66–75. https://doi.org/10.1111/j.1468-5973.2005.00458.x

Tohani, E., & Wibawa, L. (2019). The role of social capital in disaster management of disaster vulnerable village community on the Merapi eruption. Cakrawala Pendidikan, 38(3), 527–539. https://doi.org/10.21831/cp.v38i2.21821

Tookaloo, A., & Smith, R. (2015). Post occupancy evaluation in higher education. Proceedia Engineering, 118, 515–521. https://doi.org/10.1016/j.proeng.2015.08.470

Zhang, Y., & Barret, P. (2010). Findings from a post-occupancy evaluation in the UK primary schools sector. Facilities, 28(13), 641–656. https://doi.org/10.1108/02632771011083685