1.
Bayram S, Ocal ME, Laptali Oral E, Atis CD. Comparison of multi layer perceptron (MLP) and radial basis function (RBF) for construction cost estimation: the case of Turkey. JCEM [Internet]. 2016Apr.27 [cited 2024Nov.20];22(4):480-9. Available from: https://bme.vgtu.lt/index.php/JCEM/article/view/1329