[1]
Ahmed, A., Saeed, T.U. and Labi, S. 2016. Estimation of rest periods for newly constructed/reconstructed pavements. Transport. 31, 2 (Jun. 2016), 183–191. DOI:https://doi.org/10.3846/16484142.2016.1193050.